When a plastic running track needs to be renovated, it's typically due to two main reasons. The first is when the track has reached the end of its service life and no longer provides safe and effective use for athletes or users. Continuing to use an aging track can lead to injuries or discomfort. The second reason is damage caused by improper use, such as heavy objects being dropped on the surface, vandalism, or even cigarette burns that create holes or weaken the material.
[Image: Plastic track renovation]
The process of renovating a plastic running track involves several key steps to ensure the final result is both durable and functional. Here’s a detailed breakdown of the procedure:
**Step 1: Site Cleaning**
Before any work begins, the site must be thoroughly cleaned to ensure proper adhesion of new materials. This includes removing dirt with a broom or hair dryer, scraping off raised areas with a spatula, washing the ground with high-pressure water, and clearing away any plants or debris that might interfere with the work. The area should be closed off to prevent unnecessary foot traffic.
**Step 2: Repairing Damaged Areas**
Careful inspection is done to identify cracks, delamination, or sand return. Damaged sections are removed using special tools, and the base is sealed with a single-component plastic material. The mixture is then applied using a brush or scraper and left to dry. Proper mixing procedures are followed, including measuring materials accurately, avoiding water contamination, and recording each step for quality control.
**Step 3: Full Surface Coating**
Once the base is ready, the entire surface is coated with a new layer of material. This involves preparing the site, protecting surrounding facilities, and carefully spraying the mixture in layers. Each coat is checked for even coverage and allowed to dry before the next is applied.
**Step 4: Surface Preparation**
Before applying the final coating, the work area is laid out, and all necessary tools and materials are prepared. The team ensures that power supplies and access routes are properly set up, and the ground is flat and clean.
**Step 5: Final Coating Application**
A top layer of material is sprayed onto the surface, ensuring it reaches the required thickness of at least 1.5mm. The application is done in two directions to guarantee even coverage and avoid missed spots.
**Step 6: Marking and Positioning**
After the coating is dry, the track is marked according to international standards. The center line, lane lines, and other markings are carefully applied using specialized paints to ensure clarity and precision.
**Step 7: Completion and Handover**
Finally, the completed track is protected, and a maintenance manual is provided to the client. It’s recommended to wait 7–10 days before using the renovated track to allow full curing of the materials.
This detailed process ensures that the plastic running track is not only restored but also improved in terms of safety, durability, and appearance. Whether it's a small repair or a full renovation, each step plays a crucial role in delivering a high-quality result.